Screening reports
Order a site screen
Cited, public-source screening for a parcel or county. Each report footnotes every finding and flags what could not be confirmed. View a sample Quick Screen.
Products
Quick Screen
$299 one-time
A 3–5 page PDF screening of one parcel or site.
- Zoning status
- Nearest substations and transmission
- Serving utility
- Incentives
- Red flags
Typical turnaround is a few business days; turnaround confirmed at order.
Full Site Brief
$1,500 one-time
A 10–15 page PDF. Everything in the Quick Screen, plus deeper context.
- Everything in the Quick Screen
- Interconnection-queue context
- Fiber
- Water
- Comparable deals
- Local politics
Turnaround confirmed at order.
County Watch
$500/mo billed monthly
A monthly digest of changes in one county.
- Rezonings
- Utility filings
- Project changes
Monthly subscription. Cancel anytime.
Not sure? Tell us about the site
Share what you know and we will suggest the right report.
Questions
- How long does a report take?
- A Quick Screen typically takes a few business days. Turnaround is confirmed at order.
- What sources do you use?
- Public sources only: utility filings, state commission dockets, county ordinances and economic development sites, operator sites, and reputable trade and advocacy publications. See the methodology.
- Is this engineering advice?
- No. Reports are screening only, not engineering. They are not a load study, title report, or zoning determination. Verify findings with the utility, the jurisdiction, and qualified professionals.
- What is the refund policy?
- The refund policy is to be determined and will be published before checkout opens.